Audio visual and paging
Rooms that work on the first attempt, the announcement systems that carry a building, and the cabling underneath both. Nothing above the cabling performs better than the cabling does, which is why it sits in this category rather than out of sight.
Rooms
Board and council chambers
The meeting starts on time and the recording is usable afterwards, because displays, cameras, microphones and one-touch conferencing were designed as one room rather than bought as six products.
Meeting and training rooms
The room behaves the same at every site, because it is a standard kit repeated across the portfolio rather than specified building by building.
Digital signage
The lobby screen shows the right thing today, because content is scheduled rather than changed by whoever remembers.
Room support
A room that fails at 8:55 is working by 9, through pre-meeting checks, remote monitoring and same-day attendance.
Sound and notification
Public address and paging
An announcement reaches the zone it is meant for and not the whole plant, because paging is zoned to the way the site is actually used.
Mass notification
The person who sees the problem can say it, from wherever they are standing, because emergency messaging pushes to radio, phone, screens and paging at once.
Cabling and equipment rooms
Structured cabling
Nothing above it inherits a fault from it, because copper, fibre and racks are certified and the test results are handed over rather than described.
Power and equipment rooms
The rack survives the outage and stays serviceable, through UPS, cooling considerations, cable management and a layout a technician can work in.
- Physical securitySee what happened and prove it, because video, access and alarms land on one timeline you can search by door and by time.
- Network and managed ITOne compromised device stays one compromised device, because operational traffic is separated from office traffic by written policy.
- Radio and communicationsA lone worker can call for help from the far end of the site, because coverage was modelled at design and then measured on foot.
- Design and consultingThe conduit is in the wall before anyone needs it, because the systems were specified while that was still cheap to change.
Let’s talk about your project.
Early concept, active specification, out to tender, or a system already in place. Wherever you are in the process, our team can help.