The systems a facility runs on.
Take a single category or several. When more than one comes from us we write the layer between them, so a door event reaches the video system and an operator raises an announcement without changing platform. That layer is also something you can buy on its own, on systems we did not install.
- 01 · Security
Physical security
See what happened and prove it, because video, access and alarms land on one timeline you can search by door and by time.
- Video surveillance
- Access control
- Alarm systems
- Intercom and gate entry
- Video monitoring
- 02 · Network
Network and managed IT
One compromised device stays one compromised device, because operational traffic is separated from office traffic by written policy.
- Switching and routing
- Wireless
- Firewall and segmentation
- Internet and WAN
- Servers and cloud
- 03 · Radio
Radio and communications
A lone worker can call for help from the far end of the site, because coverage was modelled at design and then measured on foot.
- Two-way radios
- Radio network infrastructure
- Push-to-talk over cellular
- Accessories
- Cellular boosters
- 04 · Audio visual
Audio visual and paging
The meeting starts on time, because the room is a standard kit repeated across sites and it is checked before you walk in.
- Board and council chambers
- Meeting and training rooms
- Digital signage
- Room support
- Public address and paging
- 05 · Design
Design and consulting
The conduit is in the wall before anyone needs it, because the systems were specified while that was still cheap to change.
- System design and drawings
- Specification writing
- Basis of design reports
- Budget and class estimates
- Coverage and propagation studies
- 06 · Integration
Systems integration
An operator learns one position instead of five, because the systems are made to talk to each other rather than sat next to each other.
- Event and alarm routing
- One operating position
- Workflow and automation
- Working with what you have
- Assessment first
Let’s talk about your project.
Early concept, active specification, out to tender, or a system already in place. Wherever you are in the process, our team can help.